No Project Name Period Project Value USD Owner Scope Remark
1

Power Transmission Improvement Sector Project, ADB LOAN No. 1983-INO, Java - Bali Power Transmission System Package B5 : 150 kV Substations

2008-Present

IDR 18,892,946,611

USD 4,039,600

EUR 1,086,479

PT. PLN E-P-C

Supply, Construction and Installation  of 150 kV Substations for Kedung Badak, Mandirancan and Depok III

2 Scattered transmissions and substations export credit package 8 150 kV Gas Insulated Switchgear for Daan Mogot and Semanggi Barat

Maret 2015 – Desember 2017

(22 Months)

USD 19,517,644 0

IDR 133.190.806.144

PT. PLN E-P-C

Building 150 kV Gas Insulated switchgear (GIS) Daan Mogot, 150kV Gas Insulated switchgear (GIS) Semanggi barat dan Extention 150 kV KARET Conventional Substation  and underground cable 150kV GIS Semanggi Barat – 150 kV GI Karet and Optical Telecommunication System

3

150kV Gas Insulated Substation in Kabil, Batam

Maret 2015 – Aprl 2016

(13 Months)

IDR. 66,349,016,101 PT. PLN E-P-C

Construction of 150kV Gas Insulated Substation in Industrial Estate in Kabil, Batam