No | Project Name | Period | Project Value USD | Owner | Scope | Remark |
---|---|---|---|---|---|---|
1 |
Power Transmission Improvement Sector Project, ADB LOAN No. 1983-INO, Java - Bali Power Transmission System Package B5 : 150 kV Substations |
2008-Present |
IDR 18,892,946,611 USD 4,039,600 EUR 1,086,479 |
PT. PLN | E-P-C |
Supply, Construction and Installation of 150 kV Substations for Kedung Badak, Mandirancan and Depok III |
2 | Scattered transmissions and substations export credit package 8 150 kV Gas Insulated Switchgear for Daan Mogot and Semanggi Barat |
Maret 2015 – Desember 2017 (22 Months) |
USD 19,517,644 0 IDR 133.190.806.144 |
PT. PLN | E-P-C |
Building 150 kV Gas Insulated switchgear (GIS) Daan Mogot, 150kV Gas Insulated switchgear (GIS) Semanggi barat dan Extention 150 kV KARET Conventional Substation and underground cable 150kV GIS Semanggi Barat – 150 kV GI Karet and Optical Telecommunication System |
3 |
150kV Gas Insulated Substation in Kabil, Batam |
Maret 2015 – Aprl 2016 (13 Months) |
IDR. 66,349,016,101 | PT. PLN | E-P-C |
Construction of 150kV Gas Insulated Substation in Industrial Estate in Kabil, Batam |