along with the economy growth, the infrastructure development in Indonesia since 2006 has never shown significant betterment since 2006, when the stated owned electricity company (PLN)  launched an ambitious infrastructure project including  the construction of 10,000 MWs new coal fired power plants.

Such large power plant projects have certainly created vibrant environtment for the EPC industry that opens up many opportunities to EPC companies to take part in the implementation of the projects.

In addition, supporting facilities such as new substations and new transmission lines must also be built to supply the customer with electricity produced by the new power plant. Considering ME's built up capabilities of developing infrastructure project, ME give priorities to the following types of projects :1. High Voltage and Extra Voltage Substation and Transmission Line (HV & EHV Substation and T/L).2. Power Plant After gaining many years of Experiences, ME's capability of handling these types of project is comparable to foreign competitors such as Areva, ABB, Hitachi, Siemen only. ME's current and past projects are listed below  

 

HV & EHV Substation and T/L : 

Image

a. EPC of 60 MVA 150/20 kV installed Transformers including new and expansion of 150 kV Conventional & GIS Substations in Jakarta and Kalimantan. Multiple Contracts with total project cost of US $ 35 Million (on going projects). This Project was funded by PLN. 

b. EPC of over 1000 MVAR 150/20 kV installed capasitors in dozen of substation spreading out in Java Electricity Grid. Multiple contracts with project cost totaling US $ 5.5 million completed in 2005. This project was funded by PLN. 

c. EPC and Project Financing Arrangement of 1500 MVA 500/150 kV installed Transformer including new and expansion of 500/150 kV Conventional & GIS Substations, over 2400 MVA 150/20 kV installed Transformer including new and expansion of 150 kV Conventional & GIS Substations in Jakarta & West Java, 20 km of 500 kV T/L in a very crowded East of Jakarta, four lines or over 360 km cable circuit of 150 kV Under Ground Cable (UGC) in the heart city of Jakarta and over 150 km of 150 kV T/L in West Java. Single contract (KE-1 project) with total project cost of US$ 397 million completed in 2000. This project was financed by multiple export credit agencies including KFW, Coface and Japan Exim (now JBIC), Purchase Install Sales Agreement (PISA) Financing from Japanese Leaders, and the Indonesian Government and PLN Funds. 

d. Construction of 3000 MVA of 500 kV/ 150 kV installed Transformers including new 500 kV Conventional Substation and over 1200 MVA of installed Transformers including new and expansion of 150 kV Conventional % GIS Substation in East and West Java. Multiple contract with total projects cost of US$ 260 million completed 1996. Projects owner is PLN and financings came from Coface and Australian Loan. 

e. EPC of 45 km 150 kV T/L in West Java. Singel Contract with total project cost of $ 30 million (on going project).It is funded by PLN.  

f. EPC of 12 km 150 kV T/L in Java, Kalimantan and North Sumatera. Multiple contracts with total projects cost of US $ 4 million completed in 2003. It is funded by PLN. 

 

Power Plant :

Image 

a. EPC of 2x25 MW Coal Fired Power Plant to be built in Gorontalo-Sulawesi.

Single contract with the total project cost of US$ 70 million (on going project). IT is funded by PLN. 

b. EPC of 2x 40 MW Gas Turbine Power Plant in South Sumatera.

Single Contract with total project cost of US $ 60 million completed in 2007. It funded by PT. Meppogen and the owner of IPP. 

c. EPC of 1 x 25 MW Gas Turbine Power Plant in East Kalimantan.

Single Contract with total project cost of US $ 20 million completed in 2005. It is funded by PT. MME and the owner of IPP. 

d. EPC of 1x10 MW Diesel Power Plant in North Sulawesi.

Single Contract with total project cost of US $5.5 million completed in 2003. It is funded by PLN. 

e. Fabrication and installation of Penstock & Surge Tank of Hydro Power Plant in East Java.

Single contract with total project cost of US $ 15 million completed in 1991. Financing came from Japan ODA.  

Other Infrastructur Projects :

a. Procurement and Cosntruction (P-C) of Water Treatment Plant and Booster pumps and clean of water transmission and distribution pipe line in North Sumatera. Single contract with total project cost of US $ 6 million completed in 2006. The project owner is the local government of Medan. It is funded by ADB. 

b. P-C of Air Conditioning System and Electricity of Jakarta International Airport Phase-2. Multiple contracts with the total project cost of US $ 36 million completed in 1990. the projects owner is GOI. It is funded under a french loan.

 